Project controls.
In writing.
Good working relationships depend on clear information. Our approach connects field work, schedules, questions, approvals, and close-out documents, with responsibilities and reporting agreed at project kickoff.
Pre-pour inspection · structural slabEight controls. Named owners.
These controls guide our approach. The specific documents, responsible contacts, and reporting cadence are set for the scope and contract.
From invitation to close-out.
Bid & buyout
Takeoffs in Bluebeam, self-perform vs. sub decision by division, RFQs to qualified subs per trade with scope sheets and a bid exception form — no gaps papered over after bid day.
Preconstruction
Contract review, insurance and DIR verification for every sub, letter of intent to award, submittal schedule, baseline schedule, and a kickoff with the owner and design team.
Construction cadence
Daily log every day; weekly owner update with schedule, two-week look-ahead, open RFIs, and CO log; monthly pay application backed by the WIP review.
Close-out
Punch walk, final inspections, as-builts, O&Ms, warranties, lien releases, and a closing review — then a request for your honest feedback.
Shared information.
Clear next steps.
Each project runs on a Google Workspace control workbook — schedule, budget, RFI/submittal log, CO log, and daily reports in one place. We agree with owners and design teams on which records will be shared and how updates will be delivered. Plan markups and takeoffs live in Bluebeam Revu so every quantity traces back to a sheet.
- Weekly written update, same format every week
- Two-week look-ahead schedule
- Every RFI, submittal, and change order in one log
Corning Library · phased occupied renovationAn update you can act on.
A project update should help an owner make decisions. The outline below shows the information we aim to keep visible; the reporting format and frequency are agreed for each project.
Illustrative reporting outline — not a live project report.
Clean scope, clean paper.
Our subcontractor directory is organized by CSI division. Every RFQ goes out with a scope sheet for that division and a one-page bid exception form — so a qualified bid gets priced correctly instead of buried. Award follows a fixed sequence: LOI, contract, insurance and DIR verification, onboarding checklist, then mobilization.
- Trade invitations tailored to scope and availability
- CSLB class and DIR registration verified before award
- Lower-tier subs listed; certified payroll flowed down on public work